Muscat International Airport

The opening of the first phase of the Muscat International Airport was on December 14, 2014, which involve:

  • Northern runway, related passages and the runway infrastructure.
  • Support systems for the management of air traffic.
  • Air Traffic Control tower.
  • The Complex of Meteorology and Air traffic control.
  • Firefighting and rescue station.
  • Information Centre.
  • PACA headquarters building.
  • The road which link between Sultan Qaboos Street and November 18 the road.

The total area of the work of the third package terminal as follows: the terminal is about 580 thousand m2, including building services, car parking and annex buildings with an area of 37 thousand m2. The airport will have an annual capacity of 12 million passengers in first stage expandable to 48 million passengers annually in latter stages. The building includes at (118) booths to complete the traveling procedures and (82) a table of Immigration and Passports, including benches for VIP. The airport also encompasses (4 stars) hotels that contains (90) room with facilities. The hotels are expandable to 90 other rooms. The building contains (10) belts lines for baggage handling.

The building includes lounges for VIP, first and business class. In addition to that, there are (29) gates linked to 40 bridge to transport passengers to and from the aircraft, and (16) ground gates to transport passengers by bus. number of tethered aircraft positions bridges (29) position and (10) other positions fed by bus, and the number will rise to (30) position in future expansion, and the number of parking lots in the building of more than 7,000 positions.

Salalah Airport

Salalah Airport is one of the most promising destinations, given that its excellence geographic position and the tourism growth it usually witnesses especially during Khareef season season. The airport was opened on November 11, 2015 with capacity of about two million passengers a year and that can be expanded to six million passengers. It was built with a construction area of more than 150,000 m2 at a cost of (365) million RO, as it has huge potential in terms of systems, equipment and services provided therein, and can receive large aircraft types. It is worth mentioning that the operation of Salalah Airport actually began on 15th June 2015.

Sohar Airport

Sohar Airport, approximately 10km northwest of Sohar, which mean that passengers can avoid the two-hour long drive from/to Muscat. The airport functions as a new gateway for passenger, cargo and courier traffic in northern Oman, and a domestic and emergency alternative to Muscat International Airport. It adds to an up-to-the-minute multimodal transport network that will stimulate additional economic growth in the Sultanate of Oman. The early operation of the airport was on November 18, 2014. The third package was recently assigned. Currently, the temporary building is equipped to receive international flights, and there are discussions with international airlines to use it to run international flights to some countries such as India, Iran, Doha, and others.


The terminal space in the airport is (5,600) m2. Airport works with terminal building capacity of 500,000 per annum annually. It consists of (4) boarding bridges, and (7) booths to complete the traveling procedures. The runway length is (4) km, and width is (75) meters, and the control tower height is (37) m. Construction works for each airport have been divided into three packages, the first one includes airport road network and utilities. The second package contains construction works for the runway, taxiway, apron, and all other accessories.

Duqm Airport

Duqm airport serves as a gateway into a region with significant economic, industrial and commercial potential as it primarily handles business traffic, but may also become part of the tourism industry. The airport started its early operations in 23rd July 2014 in order to take advantage of the ready packages. The airport received around (16,489) passengers until the end of 2015 in line Muscat-Duqm at a rate of 4 flights per week. The initiation of construction works of Duqm Airport third package (passenger terminal building and related utilities) started at the beginning of 2016 for a period of two years. There are good indicators of demand for air transport services (cargo) in the airport.


The terminal space in the airport is (5,600) m2. Airport works with terminal building capacity of 500,000 per annum annually. It consists of (4) boarding bridges, and (7) booths to complete the traveling procedures. The runway length is (4) km, and width is (75) meters, and the control tower height is (37) m. Construction works for each airport have been divided into three packages, the first one includes airport road network and utilities. The second package contains construction works for the runway, taxiway, apron, and all other accessories.

Ras Al-Hadd Airport

Ras Al-Hadd Airport locates near the town of Sur in South Sharqiya region, aims to offer tourists the opportunity to sidestep lengthy road commutes from Muscat and is part of a larger plan for eco-tourism integrated projects. The airport will complement the development of a number of eco-tourist resorts along Oman’s eastern coast, with a concerted effort being made to develop the area in a manner consistent with luxury and eco-tourism, which attracts discriminating tourists who have a specific interest in the natural world.


The first and the second packages are completed, tenders postpone the third one until the establishment of tourist facilities in the region. The terminal space in the airport is (5,600) m2. Airport works with terminal building capacity of 500,000 per annum annually. It consists of (4) boarding bridges, and (7) booths to complete the traveling procedures. The runway length is (4) km, and width is (75) meters, and the control tower height is (37) m. Construction works for each airport have been divided into three packages, the first one includes airport road network and utilities. The second package contains construction works for the runway, taxiway, apron, and all other accessories.

 

Ports